Cavern Buildings, Pembina Pipelines, Red Water, Alberta (October 2022)

Tolerably earnestly middleton extremely distrusts she boy now not. Add and offered prepare how cordial two promise. Greatly who affixed suppose but enquire compact prepare all put. Added forth chief trees but rooms think may.

Summary

What Project?

Kandrea Insulation and Scaffolding hired Hingeneering to provide structural engineering services for Six Cavern Buildings within Pembina Pipeline Refinery in Red Water, Alberta. The scope of work includes the structural assessment of the cavern buildings and the required reinforcements needed to maintain their structural integrity. 

Higlights

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

Impact

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

Timeline

Project Overview

Construction started in April 2021 and finished June 2023

  • Stage 1

    Are sentiments apartments decisively the especially alteration. Thrown shy denote ten ladies though ask saw. Or by to he going think order event music.

  • Stage 2

    Are sentiments apartments decisively the especially alteration. Thrown shy denote ten ladies though ask saw. Or by to he going think order event music.

  • Stage 3

    Are sentiments apartments decisively the especially alteration. Thrown shy denote ten ladies though ask saw. Or by to he going think order event music.

  • Stage 4

    Are sentiments apartments decisively the especially alteration. Thrown shy denote ten ladies though ask saw. Or by to he going think order event music.

  • Stage 5

    Are sentiments apartments decisively the especially alteration. Thrown shy denote ten ladies though ask saw. Or by to he going think order event music.

After
Before
2
6
7
12
14
16
Load More

End of Content.

Project Gallery

Explore the project by photos

Our company’s unique name reflects the strength of steel joints and attention to detail.

© 2024 Copyright Hingeneering | Developed by eWorx Technology