Facilities Booster Station - Phase 1 - Water Infrastructure Upgrades, Sampson Cree Nation, Alberta (May 2022 - April 2024)

Tolerably earnestly middleton extremely distrusts she boy now not. Add and offered prepare how cordial two promise. Greatly who affixed suppose but enquire compact prepare all put. Added forth chief trees but rooms think may.

Summary

What Project?

HINGENEERING Consulting is proud to be the structural engineer for the Facilities Booster Station Phase 1, Water Infrastructure Upgrade in Samson Cree Nation, Alberta. The main consultant is Urban Systems for the process, mechanical and electrical engineering design. HINGENEERING is the structural engineer and City Architecture was the project architect. The pump station is 63 square meters.

Higlights

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

Impact

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec.

Timeline

Project Overview

Construction started in April 2021 and finished June 2024

After
Before
1
5
8
10
1
12
Load More

End of Content.

Project Gallery

Explore the project by photos

Our company’s unique name reflects the strength of steel joints and attention to detail.

© 2024 Copyright Hingeneering | Developed by eWorx Technology