Sindala Platform & Emerged Breakwater – NEOM KSA (April 2023 to March 2024)
Tolerably earnestly middleton extremely distrusts she boy now not. Add and offered prepare how cordial two promise. Greatly who affixed suppose but enquire compact prepare all put. Added forth chief trees but rooms think may.
Summary
What Project?
HINGENEERING Consulting was subconsultant for Civil Marine Coastal Engineering Office (CMC) to conduct following activities:
Analysis and design of steel platform used as a supply road to transport building materials.
The platform also act as a floating breakwater to disperse the waves energy from the Red Sea.
The steel platform is main beam framing on steel pipes.
Highlights
Scope of work:
1-Redesign the platform
2-Steel connections design
3-Quality control and site supervision
Impact
The steel platform was used as a supply road to transport building materials.