In a recent assignment, Hingeneering Consulting conducted the structural analysis and design for a structural steel skid required to support a movable production unit for one of our clients in Fort McMurray, AB. The challenges for that design is that there is no permanent location of the structure, so there are a lot of variabilities regarding the environmental loads such as snow and wind.
The steel skid help in the production unit transportation. It also acts as an interface between the super structure and the foundations on site..
Construction completer in October 2024